We renovate the Parliament Building in Finland to meet today’s requirements

Lemminkäinen began renovations of the main Parliament House with preparations in spring 2014. Work tunnels were excavated beneath the building at that time also. The repair work proper began in spring 2015. The work will be completed in summer 2017.

The Parliament Building was completed in 1931. Its main building has never been fully renovated before. For instance, the technical building systems were the original ones, the basement was cramped, and the interior and the facades, along with their stairs, required renovation or restoration.

We have strong experience in technically demanding, versatile and extensive renovation projects. We ensure that the entire contract is carried out on schedule and with high quality and cost efficiency.

When the renovation is completed, the Parliament will have fully restored and energy-efficient premises. Accessibility will also be improved, as the southern lift tower will be renovated to accommodate larger lifts and a service lift.

One of the most demanding parts of the contract will be the expansion of the narrow pipe tunnel in the basement area, which requires excavation in an area sensitive to vibration. A large part of the project involves replacement of the entire technical building systems, such as the heating and ventilation systems, and integrating all of these new systems into the old structures.

A unique renovation site

"Both the site and the project are unique in Finland in many ways. The Parliament Building is a unique part of our national heritage, and it is subject to continuous publicity. The museal protection results in its own challenges. The seasons and humidity conditions will change during the project, but the indoor conditions must continuously be in such a state that the works of art and specially treated surfaces do not suffer. The schedule of this major project is another challenge; this is why we chose the supplier well in advance in order to ensure a shared clear insight into the details even before the work begins," says Hannu Peltonen, Project Manager at the Parliament.

While the renovation is being done, the Parliament will be relocated to the Sibelius Academy building, where Lemminkäinen altered the concert hall to serve as a Session Hall during the winter of 2014–2015.